© 2024 New England Public Media

FCC public inspection files:
WGBYWFCRWNNZWNNUWNNZ-FMWNNI

For assistance accessing our public files, please contact hello@nepm.org or call 413-781-2801.
PBS, NPR and local perspective for western Mass.
Play Live Radio
Next Up:
0:00
0:00
0:00 0:00
Available On Air Stations

Eight Is Enough Stairways | Brookline Mid-century Modern

Season 40 Episode 20 | 23m 43s

Tommy teaches Kevin how to calculate the riser height for a set of stairs. The foundation is insulated with a DIY foam system. Radiant heat is installed, and Norm and Richard head to Santa Fe to visit the project they did 30 years ago.

Aired: 04/24/19 | Expires: 10/02/19
Funding for THIS OLD HOUSE is provided by The Home Depot and Leesa.
Extra
Wrap up Season 4 of RECUT with a $50,000 appraisal at Idaho Botanical Garden!
Visit the “City of Trees” for unbe-leaf-able Boise treasures in this half-hour RECUT.
In this half-hour RECUT, watch breathtaking Boise appraisals at Idaho Botanical Garden.
Gem State treasures sparkle in this half-hour RECUT at Idaho Botanical Garden!
Juliette (Nadine Sierra) performs "Ah! Je veux vivre" in "Roméo et Juliette"
Watch wow-worthy Woodside finds in this half-hour RECUT and learn which is up to $44,000!
In this half-hour RECUT episode, golden state treasures shine at Filoli. One is $150,000!
Watch fascinating Filoli finds in this half-hour RECUT, including one up to $100,000!
This season's first half-hour of RECUT wows our guests with a $200,000 to $330,000 find!
Filmed over 34 years, two families struggle to survive in a changing American economy.
Latest Episodes
All
  • All
  • Lexington / Glen Ridge
  • Atlanta / Newburyport / Ipswich
  • Concord Country Cape
  • Seaside Victorian Cottage
  • This Old House
  • Jamestown Net-Zero House
  • This Old House
  • This Old House Season 36
  • This Old House Season 35
Restoration of the 1887 Victorian in Glen Ridge, NJ is complete. The crew gets a tour.
A built-in bench is constructed. The primary bathroom vanity gets a new durable finish.
A baseboard detail becomes a focal point, and a prefabricated shower niche is installed.
A new brick walkway and wood fiber insulation are installed. ERVs and HRVs are discussed.
A custom jamb and threshold are built. Various water-resistive barriers are compared.
A trip is taken to the Empire State Building and the new plumbing system is discussed.
The new two-story addition is framed, and plumbing pipes are isolated from cold weather.
Termite damage is discovered. A high school student works as a framer on the project.
Work begins on the 1887 Victorian to make it suitable for multigenerational living.
A new project begins - an 1887 Victorian being renovated for multigenerational living.