© 2024 New England Public Media

FCC public inspection files:
WGBYWFCRWNNZWNNUWNNZ-FMWNNI

For assistance accessing our public files, please contact hello@nepm.org or call 413-781-2801.
PBS, NPR and local perspective for western Mass.
Play Live Radio
Next Up:
0:00
0:00
0:00 0:00
Available On Air Stations

E21 | Dorchester Triple Decker | A Project for Every Floor

Season 42 Episode 21 | 23m 42s

Tom Silva works with the new apprentices on the front door to allow it to properly open and close. The apprentices, who hail from YouthBuild, tell Kevin O'Connor about themselves, and the President of YouthBuild gives Kevin background on the program. Homeowner Carol looks at kitchen cabinets and countertop options. Richard Trethewey works with James Bouchard on the three separate HVAC systems.

Aired: 04/28/21 | Expires: 05/15/21
Funding for THIS OLD HOUSE is provided by The Home Depot and Leesa.
Extra
Return to the cozy Yorkshire Dales for an all-new season on Sunday, January 12, 2025 at 9/8c.
Appraisal: 1941 C. F. Martin 000-42 Guitar
Appraisal: 1909 Wright Brothers Homecoming Poster
Appraisal: 1968 TWA Foreign Accent Paper Uniforms
Appraisal: Louis XVI-style Porphyry & Bronze Mirror, ca. 1880
Appraisal: Chinese Opal Ring with Egg-shaped Case, ca. 1900
Appraisal: Austrian Enamel & Ebonized Cabinet, ca. 1880
Appraisal: Arts & Crafts Roycroft Inn Desk, ca. 1910
Appraisal: Marine Corps Transit Theodolite, ca. 1944
Appraisal: Altered English Tea Table, ca. 1750
Latest Episodes
All
  • All
  • Lexington / Glen Ridge
  • Atlanta / Newburyport / Ipswich
  • Concord Country Cape
  • Seaside Victorian Cottage
  • This Old House
  • Jamestown Net-Zero House
  • This Old House
  • This Old House Season 36
  • This Old House Season 35
Restoration of the 1887 Victorian in Glen Ridge, NJ is complete. The crew gets a tour.
A built-in bench is constructed. The primary bathroom vanity gets a new durable finish.
A baseboard detail becomes a focal point, and a prefabricated shower niche is installed.
A new brick walkway and wood fiber insulation are installed. ERVs and HRVs are discussed.
A custom jamb and threshold are built. Various water-resistive barriers are compared.
A trip is taken to the Empire State Building and the new plumbing system is discussed.
The new two-story addition is framed, and plumbing pipes are isolated from cold weather.
Termite damage is discovered. A high school student works as a framer on the project.
Work begins on the 1887 Victorian to make it suitable for multigenerational living.
A new project begins - an 1887 Victorian being renovated for multigenerational living.